Wednesday, 12 June 2013 16:04

Pattern AP12: Remove Control Dependency

Using this pattern a control dependency and its attributes can be removed from a process schema. Similar considerations as for AP11 can be made.


A control edge is removed from process schema S.


Assume that for a medical treatment procedure test A has to be finished before test B may be started. In an emergency situation, however, these two tests shall be performed in parallel in order to quickly treat the patient.


An existing control dependency is not needed anymore in process schema S.


Related Patterns

Parallelize Process Fragments (AP9)
Add Control Dependency (AP11)


View Animation

Read 8140 times

Get the Book!

book cover small